top of page
White Structure

Construction for Boardwalk Underneath Island Eastern Corridor

by Ir. Philip Daynes (Engineering & Risk Manager, IEC Boardwalk JV)

Date

28 November 2024

Time

Time

Register Now

About 

Keywords: 

Watch again

Reference materials

Download the presentation slides and other reference materials below.

Snapshots of the Day

Follow us on LinkedIn

  • LinkedIn
Subscribe to Our Event Notification

Thanks for subscribing!

CONTACT US

+852 3973 0502

14/F Kiu Yin Commercial Building, 361-363 Lockhart Road Wanchai, Hong Kong

Copyright ©2024 by Association of Geotechnics and Environmental Specialists (Hong Kong) Limited. All rights reserved. 

bottom of page