top of page

Construction for Boardwalk Underneath Island Eastern Corridor

Thu, 28 Nov

|

Zoom

Ir. Philip Daynes (Engineering & Risk Manager, IEC Boardwalk JV)

Tickets are not on sale
See other events
Construction for Boardwalk Underneath Island Eastern Corridor
Construction for Boardwalk Underneath Island Eastern Corridor

Time & Location

28 Nov 2024, 6:30 pm – 7:30 pm HKT

Zoom

About the event

Synopsis

The Boardwalk underneath Island Eastern Corridor (proposed Boardwalk) connecting Causeway Bay and Quarry Bay is one of the 13 projects under the $6.5 billion dedicated funding for harbourfront enhancement. With the completion of the proposed Boardwalk, the harbourfront of the northern shore of Hong Kong Island stretching from Shek Tong Tsui in Western District to Aldrich Bay in Shau Kei Wan will be fully connected, providing a continuous promenade of some 12 km long for public enjoyment. The proposed Boardwalk is approximately 2.2 kilometres (km) long and maintains a width of at least 10 metres (m) wide throughout. The western section (approximately 0.7 km long) runs from Oil Street to Tong Shui Road, whereas the eastern section (approximately 1.1 km long) runs from Tin Chiu Street to Hoi Yu Street. These two sections will be connected by the existing North Point Promenade (approximately 0.4 km long).


The Boardwalk underneath…


Share this event

bottom of page